Connecting global trade

Stainless Steel Cartridge Filter Housing

15000.00 – 50000.00 ()
Minimum order quantity1
Port of dispatchContact Supplier
Processing timeContact Supplier
Estimate pricingContact Supplier
PackagingContact Supplier
AvailabilityIn stock
Contact Supplier Supplier Information

Apply To Distribution Partner

Request For Quotation (RFQ)

unit
MOQ: 1
/ unit
Choose based on who handles shipping responsibility

Product Description

Stainless Steel Cartridge Filter Housing manufactured by PRAIMO for efficient liquid filtration and contamination control in critical industrial applications.

APPLICATIONS:
Suitable for process water, industrial fluids, chemical processing, pharmaceutical applications, food and beverage processing, water treatment, manufacturing and other liquid filtration applications.

FEATURES:
• Stainless steel construction
• Designed for industrial liquid filtration
• Available for single and multiple cartridge configurations
• Supports reliable particle and contamination removal
• Suitable for demanding industrial applications
• Easy cartridge replacement and maintenance
• Engineered for application-specific filtration requirements

BENEFITS:
• Helps improve process fluid cleanliness
• Protects downstream equipment and processes
• Supports reliable filtration performance
• Helps reduce contamination-related maintenance
• Suitable for continuous industrial operations
• Long service life with appropriate application and maintenance

CUSTOMIZATION:
Housing size, cartridge configuration, connection arrangement, material selection and filtration configuration can be customized according to application, flow requirement, operating conditions and customer requirements.

MATERIAL:
Stainless Steel.

SHIPPING:
Industrial packaging suitable for safe transportation. Shipping and delivery can be arranged according to customer location, order quantity and product configuration.

SUPPLY:
Manufactured and supplied by PRAIMO Industrial Filters & Spares Manufacturing Company.

REQUEST:
Contact PRAIMO for technical selection, customized configuration, quotation and application-specific filtration requirements.

Similar Products

Welcome to GlobPulse

How would you like to use our global B2B marketplace?

Become a Seller

Showcase products and reach global buyers instantly.

Become a Buyer

Find trusted suppliers and request quotes easily.